Drawing and Material Preparation

Engineering Department

  • Based on the BOM (Bill of Materials), coordinate file, and Gerber file provided by the customer, we will transfer the stencil aperture design to make PCB stencils, along with production program and drawings for the manufacturing machine.
  • Modify and draft ECN (Engineering Change Notice) based on production changes provided by the customer before production, ensuring that each revision and change is fully documented and traceable.
工程部
工程部

Factory Affair Section

  • After feeding the materials, use an X-RAY tray machine or a manual tray machine to do the counting operation.
  • Prepare materials based on the BOM (Bill of Materials) provided by the customer.
  • Establish an error-proofing mechanism to avoid an incorrect load of materials.
廠務課
廠務課
廠務課

Smart warehousing

  • Use smart warehousing in conjunction with an ERP (Enterprise Resource Planning) system to manage materials.
  • Using smart warehousing allows for quick and accurate material storage and retrieval, reducing labor waste and increasing efficiency.
  • When issuing the materials, input the work order number in the system. The system will immediately follow the first-in, first-out (FIFO) mechanism to indicate the storage location with light signals based on the required material number and quantity, thereby improving operational efficiency.
智能倉儲
智能倉儲
智能倉儲
智能倉儲
智能倉儲